SMED (single-minute exchange of die) cuts changeover time by filming and timing the current changeover, separating tasks that need the line stopped (internal) from tasks that can be done while it runs (external), moving as much work as possible to external, and then simplifying what remains with quick-release parts, standard settings and parallel work. On blister lines, line clearance, film threading, format parts, feeders and first-off checks dominate. Modern integrated lines claim full changeovers in about 30 minutes; many older lines take several hours.
Step 1: Measure the current changeover
- Define changeover as last good pack of batch A to first good pack of batch B at full speed.
- Video the whole changeover, including line clearance and QA release.
- List every task with its time and who does it.
Step 2: Separate and convert
| Task | Typical status before | Convert to external by |
|---|---|---|
| Fetching format parts and tools | Internal | Changeover trolley pre-staged and checked |
| Bringing films, foils and cartons | Internal | Materials staged and verified before stop |
| Preheating sealing tools | Internal | Second set preheated off-line where design allows |
| Printing plates and batch data | Internal | Prepared and approved in advance; recipe download |
| Documentation | Internal | Batch record and line clearance forms prepared ahead |
Step 3: Streamline internal work
- Quick-release, tool-free format parts; colour-coded and keyed to avoid errors.
- Fixed stops and scales instead of adjustment by trial.
- Recipe-driven servo positions.
- Two people working in parallel with a defined sequence.
- Standard film splicing to cut threading time.
- Pre-agreed first-off checks so QA release is fast.
Step 4: Do not forget line clearance
Line clearance is a GMP requirement to prevent mix-ups and often takes as long as the mechanical changeover. Design it in: open guarding, few hidden areas, vacuum cleaning points, a checklist with photos, and clear zones for removed materials. Then standardise the new method, train, and track changeover time per batch. Machines designed for quick changeover help; see integrated blister lines and multi-SKU packaging.
Companies listed in the Hello Pharma supplier directory
The Hello Pharma supplier directory lists 14 companies relevant to this guide, grouped below by machine type or category. Each name links to the company's directory entry, with a description, technologies, location and website. Companies confirmed against their websites or public listings appear first in each group.
Inclusion is not an endorsement or ranking. Many categories are inferred from company names and segments, so confirm capabilities, approvals and service reach directly with each supplier. Search all 1,232 companies.
Blister packing (13)
Accupack Engineering Pvt Ltd; Accurate Machines; ACG Worldwide Solid Dosage Consumables and Machinery; Autopack Industries; Bliss-ca Technologies; Elmach Packages (India) Pvt Ltd; Parle Global Technologies Pvt. Ltd.; Salesworth Synergies LLP; Anchor Mark Pvt Ltd; Doctor Pack India Pvt. Ltd.; Groynetech; Sriven Autopac Pvt. Ltd.; Vandana Electronics (Pharma Packaging Solutions).
Open the full entries: Packaging machinery list filtered to blister packing · Oral solid dosage equipment list filtered to blister packing · Distribution, trade and services list filtered to blister packing
Change parts (3)
Accupack Engineering Pvt Ltd; Autopack Industries; Pharma Spares Pvt. Ltd..
Open the full entries: Packaging machinery list filtered to change parts · Components and spares list filtered to change parts
Frequently asked questions
What is SMED?
Single-minute exchange of die: a method to cut changeover time by moving work outside machine downtime and simplifying what remains.
How long should a blister line changeover take?
Modern integrated lines claim about 30 minutes for a full format change by one person; older lines often take several hours.
Does line clearance count as changeover?
Yes. From a capacity point of view, the line is not producing during line clearance, so include it in measurement and improvement.
What gives the biggest gains?
Usually pre-staging parts and materials, tool-free format parts, and standard settings that remove trial-and-error adjustment.
Related guides
Sources
- BEC 300 changeover under 30 minutes, Uhlmann
- Integrated blister-cartoner line BEC 500, Healthcare Packaging
- Tracking elusive OEE in pharmaceutical packaging, Healthcare Packaging
- 21 CFR Part 211 Subpart G, eCFR
This guide is general information to support decisions and is not engineering, validation or regulatory advice for a specific project.
