No supplier can sell an 'Annex 1 certified' line; compliance belongs to the manufacturer's contamination control strategy. What suppliers can deliver are features that make compliance easier: RABS or isolators with first air protection, automated and validated isolator bio-decontamination, filtration skids that support pre-use post-sterilisation integrity testing (PUPSIT), 100% in-process control, fewer glove ports and interventions, and integrated environmental monitoring. Major suppliers include groninger with SKAN, Syntegon, Bausch+Ströbel, IMA, Optima and Vanrx, alongside Asian and Indian builders.
Annex 1 features to specify
| Annex 1 theme | Equipment feature |
|---|---|
| Barrier technology (section 4) | RABS or isolator; expected for new installations unless justified |
| First air and unidirectional airflow (4.19 to 4.20) | Machine layout that keeps nothing between HEPA filter and open containers; smoke studies recorded on video |
| Isolator decontamination (4.22) | Automated, validated bio-decontamination such as vaporised hydrogen peroxide |
| Sterile filtration (8.87) | Filter skid allowing pre-use post-sterilisation and post-use integrity testing without breaking sterility |
| Interventions | Fewer glove ports, automated loading, robotics, no-touch transfer |
| Monitoring | Continuous particle monitoring and active air sampling in Grade A, integrated data |
| Lyophilizer loading (8.123) | Automatic loading or barrier separation, otherwise sterilisation before each load |
PUPSIT in practice
Annex 1 paragraph 8.87 requires the sterilised filter assembly to be integrity tested before use (PUPSIT) and after use before removal from its housing. In practice this needs a filtration skid or single-use assembly with a sterile downstream side for the test, venting and drainage. The annex also explains what to do where PUPSIT is not feasible, based on risk. Ask suppliers how their skids handle wetting, test and drain without compromising the sterile path.
Suppliers to evaluate
| Supplier | Examples of Annex 1 related offerings |
|---|---|
| groninger with SKAN | integra integrated isolator filling line, first air design, 100% IPC |
| Syntegon | Filling lines with isolators, RTU and bulk; Annex 1 compliance services |
| Bausch+Ströbel | VarioSys and filling lines with isolator integration |
| IMA | Aseptic vial, ampoule and syringe lines with barrier systems |
| Optima | Nested and bulk filling lines with isolators and lyophilization |
| Vanrx | Robotic, gloveless isolator filling for small batches |
| Asian and Indian builders | Truking, Tofflon, ACG and others; growing isolator capability at lower cost |
Questions to ask suppliers
- How does the design protect first air at every open-container step?
- How many glove ports, and which interventions remain?
- How is bio-decontamination validated and how long does a cycle take?
- How does the filtration design support PUPSIT?
- What smoke study and media fill support is provided?
Companies listed in the Hello Pharma supplier directory
The Hello Pharma supplier directory lists 20 companies relevant to this guide, grouped below by machine type or category. Each name links to the company's directory entry, with a description, technologies, location and website. Companies confirmed against their websites or public listings appear first in each group.
Inclusion is not an endorsement or ranking. Many categories are inferred from company names and segments, so confirm capabilities, approvals and service reach directly with each supplier. Search all 1,232 companies.
Vial and ampoule lines (11)
Brio Pharma Technologies Pvt Ltd; Brothers Pharmamach (I) Pvt Ltd; Compromec; Food & Pharma Specialities; GMP Equipment Pvt Ltd; NKP Pharma Pvt. Ltd.; Snowbell Machines Pvt Ltd; The United Engineering Company; Tofflon (India) Pvt. Ltd; Ambica Pharma Machines Pvt. Ltd.; Sterimax Engineering Pvt. Ltd..
Open the full entries: Sterile, injectable and liquid equipment list filtered to vial and ampoule lines · Packaging machinery list filtered to vial and ampoule lines · Oral solid dosage equipment list filtered to vial and ampoule lines
Isolators and RABS (4)
Fabtech Technologies International Ltd.; Getinge India Pvt Ltd; Snowbell Machines Pvt Ltd; Tofflon (India) Pvt. Ltd.
Open the full entries: Sterile, injectable and liquid equipment list filtered to isolators and rabs · Engineering and validation services list filtered to isolators and rabs
Sterile, injectable and liquid equipment (16)
Adam Fabriwerk; Brio Pharma Technologies Pvt Ltd; Compromec; Getinge India Pvt Ltd; Indo German Pharma Engineers; Machinfabrik Industries Pvt. Ltd.; NKP Pharma Pvt. Ltd.; Pharmalab India Pvt Ltd; Propack Technologies Pvt Ltd; S.K. Pharma Machinery Pvt Ltd; Snowbell Machines Pvt Ltd; The United Engineering Company; Tofflon (India) Pvt. Ltd; Ambica Pharma Machines Pvt. Ltd.; Ozone Overseas Pvt. Ltd.; Sterimax Engineering Pvt. Ltd..
Open the full entries: Sterile, injectable and liquid equipment list
Frequently asked questions
Can a filling line be Annex 1 certified?
No. Annex 1 applies to the manufacturer. Suppliers provide features that support compliance within the manufacturer's contamination control strategy.
Does Annex 1 require isolators?
It encourages RABS or isolators without mandating them, but new facilities need clear reasons if barrier technology is not used.
What is PUPSIT?
Pre-use post-sterilisation integrity testing: testing the sterilised filter before filtration, in addition to the post-use test, required by Annex 1 paragraph 8.87.
When did Annex 1 become effective?
The revised Annex 1 became effective on 25 August 2023, with the lyophilizer requirement in point 8.123 effective from 25 August 2024.
Related guides
Sources
- What are the GMP requirements for sterile production according to Annex 1?, ECA Academy
- PUPSIT in the new EU GMP Annex 1, ECA Academy
- What you need to know about the Annex 1 revision, NSF
- integra integrated vial filling line, SKAN
- Annex 1 compliance services, Syntegon
This guide is general information to support decisions and is not engineering, validation or regulatory advice for a specific project.
