Short answer

Revised Schedule M, notified on 28 December 2023 and binding on every Indian drug manufacturing unit since 1 January 2026, requires equipment to be designed, located and maintained to minimise errors and contamination, made of non-reactive contact materials, calibrated, cleaned on a fixed schedule with validated procedures, qualified, and documented with current drawings. Use the checklist on this page to audit each area of a plant against those clauses.

Where Schedule M stands in 2026

The revised Schedule M to the Drugs Rules, 1945 was notified by G.S.R. 922(E) on 28 December 2023 under the title Good Manufacturing Practices and Requirements of Premises, Plant and Equipment for Pharmaceutical Products. It adds a pharmaceutical quality system, quality risk management, product quality review, and qualification and validation of equipment, bringing Indian GMP closer to WHO and PIC/S expectations.

Larger manufacturers had to comply first. Manufacturers with turnover of ₹250 crore or less could seek an extension to 31 December 2025 by filing an upgrade plan in Form A, with applications due by 11 May 2025. That window has closed, and the revised schedule now applies to every unit, with inspections under way.

What the equipment clauses require

RequirementWhat it means on the shop floor
Design and installation minimise errors and contaminationLayout allows cleaning and maintenance; no dead legs or hard-to-reach areas; logical material flow
Fixed pipework labelled with contents and flow directionLabels on process, utility and service lines
Non-interchangeable connections for hazardous substancesDedicated fittings for gases and hazardous liquids
Balances and measuring equipment of suitable range and precision, calibrated regularlyCalibration schedule, status labels, certificates traceable to standards
Production equipment cleaned on a fixed scheduleCleaning SOPs, logs and status labels for every machine
Washing, cleaning and drying equipment not a source of contaminationClean storage of parts, validated drying, controlled washing areas
Product-contact parts non-reactive, non-additive and non-absorptiveContact parts typically in suitable stainless steel or approved polymers, with material certificates
Defective equipment removed or clearly labelledOut-of-service tags and a removal procedure
Closed equipment used where possible; precautions for open equipmentClosed transfer, covered vessels, local extraction
Validated cleaning between products on non-dedicated equipmentCleaning validation with justified limits
Current drawings of critical equipment and support systemsUp-to-date P&IDs, GA drawings and change control
Summarised from published notes on Point 13 (Equipment) of revised Schedule M. Read the official notification for the full text.

Area-by-area checklist

Dispensing and raw material handling

  • Balances calibrated and suited to the quantities weighed, with daily checks recorded.
  • Dispensing under local exhaust or a dispensing booth, with cleaning records.

Granulation, drying and blending

  • Contact parts with material certificates; gaskets of approved materials.
  • Fluid bed filter bags controlled and changed per product where required.
  • Cleaning validation in place for shared granulators, dryers and blenders.

Compression, encapsulation and coating

  • Punch and die inspection and storage records; tooling cleaned and stored to avoid damage.
  • Dust extraction and deduster performance checked; metal detectors challenged with test pieces.
  • Coating pans with spray system calibration and solvent area controls where solvents are used.

Packaging

  • Line clearance procedures and records between batches.
  • Vision systems, checkweighers and code verification challenged at start-up.

Sterile areas

  • Sterilisers, depyrogenation tunnels and filling machines qualified, with requalification after changes.
  • Filter integrity testing and sterilisation records for product-contact parts.

Utilities and quality control

  • Purified water and HVAC systems qualified and monitored; drawings current.
  • Laboratory instruments suitable for the tests performed and calibrated.

Qualification and computerised systems

Revised Schedule M adds explicit requirements for qualification and validation. For equipment that means a documented life cycle: user requirements, design qualification, installation, operational and performance qualification, and requalification after significant changes. Equipment with computerised controls also needs validation of the software, controlled access and protection of electronic records. When buying new machines, write these needs into the purchase order and require the supplier to provide qualification protocols and documents.

Prioritising upgrades on a budget

  1. Fix anything that creates direct product risk first: contact materials, cleaning and cross-contamination, and sterile-area equipment.
  2. Next, close documentation gaps that inspectors check quickly: calibration, logs, status labels and drawings.
  3. Then plan qualification of existing equipment, starting with the most critical machines.
  4. Replace equipment only where it cannot be made compliant at reasonable cost, and use the purchase to standardise documentation.

Companies listed in the Hello Pharma supplier directory

The Hello Pharma supplier directory lists 131 companies relevant to this guide, grouped below by machine type or category. Each name links to the company's directory entry, with a description, technologies, location and website. Companies confirmed against their websites or public listings appear first in each group.

Inclusion is not an endorsement or ranking. Many categories are inferred from company names and segments, so confirm capabilities, approvals and service reach directly with each supplier. Search all 1,232 companies.

Engineering and validation services: Indian companies (27)

D.D. Enterprises; Fabtech Technologies International Ltd.; Anvay Pharma Systems Pvt. Ltd.; Aspire India; Autocal Solutions Pvt. Ltd.; Bio Pharm Engineering; Camfield Engineers; Centech Engineers Pvt. Ltd.; EMCO Engineering; Hexagon Product Development Pvt. Ltd.; June Enterprises Pvt Ltd.; Landsky Engineers Pvt. Ltd.; M K Teknology 1 Pvt. Ltd.; Metina Pharmconsulting Private Limited; Orbit Technologies Pvt. Ltd.; Parth Engineers & Consultant; Pharmatech Engineering Company; Pharmintech Turnkey Solutions Pvt Ltd; Pratham Technologies Pvt. Ltd.; Rihim Pharma Consultancy Pvt. Ltd.; Sergusa Solutions Pvt. Ltd.; Skytech Systems (India) Pvt.Ltd.; SMMS Engineering Systems Pvt. Ltd.; SpectrumPharmaTECH Consultants Pvt. Ltd.; SRJ Engineers Pvt. Ltd.; TechnoValue Solutions Pvt Ltd; Vishva Protech Pvt. Ltd..

Open the full entries: Engineering and validation services list

Cleanroom, HVAC and containment: Indian companies (25)

Airtech Systems India Pvt. Ltd.; Gandhi Automations Pvt. Ltd.; GMP Technical Solutions Pvt Ltd; A.C. Humidin Air Systems Pvt. Ltd.; Aastha Cleanroom Systems Private Limited; Ace Hygiene Product Pvt Ltd (Alfaa UV); Bry-Air (Asia) Private Limited; Clean Coats Pvt. Ltd.; Contec Airflow Pvt. Ltd.; Esco Biotech Pvt. Ltd.; Hvax Technologies Pvt. Ltd.; Idealin Fogging Systems; Integrated Cleanroom Technology Pvt. Ltd.; Khimsaria Associates; Khosla Profil Pvt. Ltd.; Kleantech Engineering Systems Pvt. Ltd.; Moreschi Asia Doors P Ltd; Pharma Air Modular System; Radiant Enterprise; Russair Technologies Pvt. Ltd.; Sanosil Biotech Pvt. Ltd.; Shree Aerodynamic Products; Suntec Teknopak Cleanrooms & Containments; Synergy Thrislington; Ultramax Hydrojet Pvt Ltd.

Open the full entries: Cleanroom, HVAC and containment list

Water and utilities: Indian companies (12)

Christ Nishotech Water Systems Pvt Ltd; Hydropure Systems Pvt. Ltd.; Praj HiPurity Systems Limited.; Sainath Boilers; Aquamech Engineering Corporation; CQM Raj Enviro India Private Limited; Energy Plus; Enviro Technologies; Indu IonPure India Pvt. Ltd.; Rehoboth Enviro Systems; Sanpure Systems Pvt Ltd; Wab India Pvt. Ltd..

Open the full entries: Water and utilities list

Lab and analytical: Indian companies (67)

Amkette Analytics Ltd; Electrolab India Pvt Ltd; Newtronic Lifecare Equipment Pvt Ltd; Thermolab Scientific Equipments Pvt Ltd; A.T.E. Enterprises Private Limited; Abdos Labtech (P) Ltd.; Ablaze Glass Works Pvt. Ltd.; ACZET PVT LTD; Aditya Scientific; Amar Equipments Pvt Ltd; Analab Scientific Instruments Pvt Ltd; Analytical Technologies Ltd; Anatek Services Pvt Ltd; Apex Chromatography Pvt. Ltd.; Borosil Glass Works Ltd.; BRAND Scientific Equipment Pvt. Ltd.; BRK Instruments India LLP; Central Drug House; Central Drug House (P) Ltd.; Chemsynth Fine Chemicals (PureSynth Research Chemicals GmbH); Chiron Instruments (I) Pvt Ltd; Chromachemie Laboratory Private Limited; Chromatopak Analytical Instrumentation (I) Pvt. Ltd.; Contech Instruments Ltd.; Elixir Scientific India Pvt Ltd; FABLAB Engineering India Pvt. Ltd.; First Source Laboratory Solutions; GD Lab Solutions Pvt. Ltd.; Goel Scientific Glass Works Ltd.; Hemochrom; HiMedia Laboratories Pvt Ltd; Humidity Technologies Pvt Ltd.; Impact Labs Pvt Ltd; Inkarp Instruments; International Trade Links Instrumentation Pvt. Ltd.; Kitten Enterprises Pvt. Ltd; Lab Devices (India) Pvt. Ltd.; Labguard India Pvt Ltd; Labindia Instruments Pvt. Ltd.; Labtop Instruments and 27 more.

Open the full entries: Lab and analytical list

Frequently asked questions

When did revised Schedule M become mandatory for small manufacturers?

Manufacturers with turnover of ₹250 crore or less that filed Form A had until 31 December 2025. Since 1 January 2026 the revised schedule applies to every manufacturing unit in India.

Does revised Schedule M require equipment qualification?

Yes. It adds qualification and validation as an explicit requirement, so equipment needs documented installation, operational and performance qualification, and requalification after significant changes.

What materials should product-contact parts be made of under Schedule M?

Schedule M requires product-contact parts to be non-reactive, non-additive and non-absorptive. In practice this usually means suitable grades of stainless steel and approved polymers, backed by material certificates.

Is revised Schedule M aligned with WHO-GMP?

Its revisions were designed to bring Indian GMP closer to WHO and PIC/S expectations, adding a pharmaceutical quality system, quality risk management, product quality review and validation requirements.

Related guides

Sources

  1. India tightens GMP standards for the pharmaceutical industry, India Briefing
  2. India extends GMP compliance deadline to December 2025, India Briefing
  3. Health ministry unlikely to extend Schedule M deadline for MSME pharma, Business Standard
  4. Key notes on revised Schedule M: equipment, The Health Master
  5. Health Ministry revises pharma manufacturing rules under Schedule M, Business Standard
  6. JSA Prism: revised Schedule M, JSA Law

This guide is general information to support decisions and is not engineering, validation or regulatory advice for a specific project.

Ready to read pharma differently?

Join the Hello Pharma community for editorial, intelligence and engineering reference from pharma manufacturing.