Checklist · Compliance and validation

Equipment Qualification Checklist for a New Pharma Plant

By the Hello Pharma Editorial Team · Last updated 19 November 2026 · 3 min read

Short answer

Qualify a new plant in a logical order: write the validation master plan and URSs, perform design reviews and DQ, then commission and qualify utilities (HVAC, water, compressed air, steam) first because equipment depends on them, then process equipment (FAT, SAT, IQ, OQ), computerised systems, cleaning validation, PQ and finally process validation batches. Use risk assessment to focus effort on critical aspects, leverage supplier testing, and plan requalification and change control from the start.

Sequence

  1. Validation master plan: scope, responsibilities, approach, schedule.
  2. URS for each system, and system risk assessments.
  3. Design reviews and DQ against the URS and GMP.
  4. Utilities: commissioning and qualification of HVAC and cleanrooms, purified water and WFI, compressed air and gases, steam.
  5. Equipment: FAT, installation, SAT, IQ, OQ.
  6. Computerised systems: validation of control systems, SCADA, MES and laboratory systems.
  7. Cleaning validation for product contact equipment.
  8. PQ of equipment and utilities under routine conditions.
  9. Process validation batches, then continued process verification.
  10. Handover: SOPs, training, maintenance and calibration programmes, requalification schedule.

Checklist by system

SystemKey qualification checks
HVAC and cleanroomsAirflow, pressure cascades, filter integrity, particle classification, recovery, temperature and humidity
Water systemsChemical and microbial quality over a defined monitoring period, sanitisation
Compressed air and gasesOil, water and particle content; microbial quality where product contact
Process equipmentInstallation, functions, alarms, performance with product
Control systemsAccess, audit trails, data backup, recipes; see Part 11
Laboratory instrumentsInstrument qualification and software validation

Timeline and efficiency tips

  • Utilities qualification, especially water monitoring, often sets the critical path.
  • Use risk assessment to decide test depth (ICH Q9(R1), ISPE C&Q guide, ASTM E2500).
  • Leverage supplier FAT and SAT under EU GMP Annex 15 rather than repeating tests; see FAT and SAT.
  • Keep a live traceability matrix from requirements to tests.
  • Freeze designs and software early; late changes multiply rework.

Companies listed in the Hello Pharma supplier directory

The Hello Pharma supplier directory lists 40 companies relevant to this guide, grouped below by machine type or category. Each name links to the company's directory entry, with a description, technologies, location and website. Companies confirmed against their websites or public listings appear first in each group.

Inclusion is not an endorsement or ranking. Many categories are inferred from company names and segments, so confirm capabilities, approvals and service reach directly with each supplier. Search all 1,232 companies.

Validation services (13)

Airtech Systems India Pvt. Ltd.; Bliss-ca Technologies; D.D. Enterprises; Salesworth Synergies LLP; Thermolab Scientific Equipments Pvt Ltd; Autocal Solutions Pvt. Ltd.; Hyde Engineering + Consulting; June Enterprises Pvt Ltd.; Metina Pharmconsulting Private Limited; Pratham Technologies Pvt. Ltd.; Sergusa Solutions Pvt. Ltd.; SpectrumPharmaTECH Consultants Pvt. Ltd.; TechnoValue Solutions Pvt Ltd.

Open the full entries: Engineering and validation services list filtered to validation services · Lab and analytical list filtered to validation services · Packaging machinery list filtered to validation services · Cleanroom, HVAC and containment list filtered to validation services

Engineering services (31)

Adam Fabriwerk; Bectochem Consultant & Engineers Pvt. Ltd.; D.D. Enterprises; Fabtech Technologies International Ltd.; GMP Technical Solutions Pvt Ltd; Praj HiPurity Systems Limited.; Propack Technologies Pvt Ltd; Snowbell Machines Pvt Ltd; Tofflon (India) Pvt. Ltd; Anvay Pharma Systems Pvt. Ltd.; Aspire India; Bio Pharm Engineering; Camfield Engineers; Centech Engineers Pvt. Ltd.; EMCO Engineering; Hexagon Product Development Pvt. Ltd.; Hyde Engineering + Consulting; Landsky Engineers Pvt. Ltd.; M K Teknology 1 Pvt. Ltd.; MRC Systems FZE; Orbit Technologies Pvt. Ltd.; Parth Engineers & Consultant; Pharmatech Engineering Company; Pharmintech Turnkey Solutions Pvt Ltd; Pratham Technologies Pvt. Ltd.; Rihim Pharma Consultancy Pvt. Ltd.; Skytech Systems (India) Pvt.Ltd.; SMMS Engineering Systems Pvt. Ltd.; SpectrumPharmaTECH Consultants Pvt. Ltd.; SRJ Engineers Pvt. Ltd.; Vishva Protech Pvt. Ltd..

Open the full entries: Engineering and validation services list filtered to engineering services · Sterile, injectable and liquid equipment list filtered to engineering services · Water and utilities list filtered to engineering services · Cleanroom, HVAC and containment list filtered to engineering services

Frequently asked questions

What should be qualified first in a new plant?

Utilities such as HVAC and water systems, since equipment qualification and production depend on them.

What is a validation master plan?

A document setting out the scope, approach, responsibilities, schedule and status of qualification and validation for the site or project.

How long does plant qualification take?

It depends on size and complexity; water system monitoring and process validation often take several months each and set the timeline.

Can qualification be risk-based?

Yes. EU GMP Annex 15, ICH Q9(R1), the ISPE C&Q guide and ASTM E2500 all support focusing effort on aspects critical to product quality.

Related guides

Sources

  1. EU GMP Annex 15 qualification and validation, European Commission
  2. Best practices preparing commissioning and qualification, ISPE
  3. Driving the future of commissioning and qualification, ISPE
  4. Road to success: ISPE Baseline Guide Vol 5 second edition, AMTS

This guide is general information to support decisions and is not engineering, validation or regulatory advice for a specific project.

Ready to read pharma differently?

Join the Hello Pharma community for editorial, intelligence and engineering reference from pharma manufacturing.