Verify a pharma machinery supplier in seven steps: confirm legal identity and track record; check ISO 9001 on IAF CertSearch and the CE Declaration of Conformity (and any notified body on NANDO); call references using the same model at regulated sites; audit the factory in person or through a third party; review sample DQ, FAT, IQ, OQ and material documents before ordering; witness FAT with your product; and confirm service, spares and payment terms tied to FAT and SAT milestones. Treat claims such as 'GMP certified machine' or 'FDA approved' as red flags.
Seven-step verification checklist
- Identity: company registration, years in business, ownership, factory address (check on maps and in person).
- Certificates: ISO 9001 via IAF CertSearch; CE Declaration of Conformity for the exact model; notified body number on NANDO where applicable; see verification guide.
- References: at least three customers with the same model, ideally at USFDA, EU or WHO-PQ inspected sites; call them.
- Factory audit: assembly, welding, polishing, testing and document control; third-party inspectors are an option.
- Documents: sample DQ, FAT, IQ and OQ protocols, 316L and surface finish certificates, Part 11 assessment; see supplier documents.
- FAT: witnessed, with your product or placebo and agreed acceptance criteria; see FAT and SAT.
- Service and payment: engineers and spares in your region; milestones tied to FAT and SAT; letter of credit or escrow for new suppliers.
Red flags
| Red flag | Why it matters |
|---|---|
| "GMP certified" or "FDA approved" machine | Machines are not certified or approved this way; claim suggests weak understanding |
| No references with the same model | Unproven design or poor performance |
| Refuses factory visit | May be a trader, not a manufacturer |
| Certificate not on IAF CertSearch | May be from an unaccredited body or invalid |
| Large advance payment demanded | High financial risk |
| Shared HMI logins, no audit trail | Data integrity risk at inspection |
Using the checklist
Score each supplier on every step, record evidence in your vendor qualification file, and repeat key checks for each new machine type. Regional guides: China, India, Germany.
Companies listed in the Hello Pharma supplier directory
The Hello Pharma supplier directory lists 446 companies relevant to this guide, grouped below by machine type or category. Each name links to the company's directory entry, with a description, technologies, location and website. Companies confirmed against their websites or public listings appear first in each group.
Inclusion is not an endorsement or ranking. Many categories are inferred from company names and segments, so confirm capabilities, approvals and service reach directly with each supplier. Search all 1,232 companies.
Machinery, engineering and service categories
- Oral Solid Dosage Equipment Suppliers: 73 companies
- Pharmaceutical Packaging Machinery Suppliers: 40 companies
- Sterile, Injectable and Liquid Processing Equipment Suppliers: 16 companies
- Process Plant Equipment Suppliers: Reactors, Vessels, Pumps and Filtration: 50 companies
- Cleanroom, HVAC and Containment Suppliers: 31 companies
- Pharmaceutical Water and Utility System Suppliers: 13 companies
- Laboratory and Analytical Equipment Suppliers: 85 companies
- Automation, Inspection and Serialization Suppliers: 48 companies
- Pharma Machinery Components and Spares Suppliers: 25 companies
- Pharmaceutical Packaging Materials Suppliers: 36 companies
- Pharma Engineering, Turnkey and Validation Service Providers: 29 companies
Frequently asked questions
How do I verify a pharma machinery supplier?
Check identity, certificates (IAF CertSearch, CE, NANDO), references with the same model, audit the factory, review documents, witness FAT and confirm service and payment terms.
Can a machine be GMP certified?
No. GMP applies to manufacturers. Machines support GMP through design and documentation.
Is a factory audit necessary?
For significant purchases, yes. It confirms the supplier is a real manufacturer and shows build and document quality.
How should payments be structured?
Tie milestones to order, FAT and SAT, and use a letter of credit or escrow with new suppliers.
Related guides
Sources
- IAF CertSearch, International Accreditation Forum
- NANDO notified bodies database, European Commission
- EU GMP Annex 15: qualification and validation, European Commission
- WHO GMP main principles (TRS 986, Annex 2), WHO
This guide is general information to support decisions and is not engineering, validation or regulatory advice for a specific project.
