GMP requires that personnel receive initial and ongoing training, and that its effectiveness is verified (EU GMP Chapter 2 and Directive (EU) 2017/1572). For new machines, supplier training at commissioning should cover operation, cleaning, changeover, troubleshooting, maintenance and data integrity features, with documented attendance and competence checks. After commissioning, build machine-specific SOP training, refresher sessions, and qualification of operators before they run production alone.
GMP requirements
- Initial and continuing training for all personnel whose duties affect quality.
- Approved training programmes, documented and attributable records.
- Practical effectiveness of training periodically assessed.
- Training records are GMP records; see data integrity.
What supplier training should include
| Audience | Topics |
|---|---|
| Operators | Start-up, operation, IPC, alarms, shutdown, cleaning, changeover |
| Maintenance technicians | Preventive maintenance, adjustments, wear parts, troubleshooting, safety |
| Engineering and automation | PLC/HMI, recipes, backups, network and remote access |
| QA and validation | Audit trail, user management, critical parameters, qualification links |
Ask for training materials in local languages and include training deliverables in the purchase contract and FAT/SAT plans; see FAT and SAT.
Keeping skills current
- Machine-specific SOPs with practical sign-off.
- Competence assessment before independent operation.
- Refresher training after changes, deviations or long gaps.
- Digital tools: e-learning, AR work instructions and guided changeovers.
- Link training to OEE and deviation trends; see OEE.
Companies listed in the Hello Pharma supplier directory
The Hello Pharma supplier directory lists 446 companies relevant to this guide, grouped below by machine type or category. Each name links to the company's directory entry, with a description, technologies, location and website. Companies confirmed against their websites or public listings appear first in each group.
Inclusion is not an endorsement or ranking. Many categories are inferred from company names and segments, so confirm capabilities, approvals and service reach directly with each supplier. Search all 1,232 companies.
Machinery, engineering and service categories
- Oral Solid Dosage Equipment Suppliers: 73 companies
- Pharmaceutical Packaging Machinery Suppliers: 40 companies
- Sterile, Injectable and Liquid Processing Equipment Suppliers: 16 companies
- Process Plant Equipment Suppliers: Reactors, Vessels, Pumps and Filtration: 50 companies
- Cleanroom, HVAC and Containment Suppliers: 31 companies
- Pharmaceutical Water and Utility System Suppliers: 13 companies
- Laboratory and Analytical Equipment Suppliers: 85 companies
- Automation, Inspection and Serialization Suppliers: 48 companies
- Pharma Machinery Components and Spares Suppliers: 25 companies
- Pharmaceutical Packaging Materials Suppliers: 36 companies
- Pharma Engineering, Turnkey and Validation Service Providers: 29 companies
Frequently asked questions
What does GMP require for equipment training?
Initial and ongoing training for relevant staff, documented records, and periodic assessment of effectiveness.
Should the machine supplier provide training?
Yes. Include operator, maintenance and automation training in the contract, with documented competence checks.
How do I assess training effectiveness?
Practical sign-offs, observation, tests, and tracking errors, deviations and OEE after training.
Can AR or e-learning replace hands-on training?
They support it well, but hands-on practice and competence checks remain essential.
Related guides
Sources
- EU GMP training requirements (Chapter 2), Learnsignal
- Efficient GMP training systems (Directive 2017/1572), ECA Academy
- How to manage annual GMP trainings efficiently, ECA Academy
- Produce more efficiently and more securely (AR guidance), Optima
This guide is general information to support decisions and is not engineering, validation or regulatory advice for a specific project.
